{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/0632c671ea124d37b76a0b243a36103e\" frameborder=\"0\" width=\"1920\" height=\"1440\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1440,"width":1920,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1440,"thumbnail_width":1920,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/0632c671ea124d37b76a0b243a36103e-0d060c06fa7b5f2e.gif","duration":292.138667,"title":"Grid Orchestration with Human Approval Safety","description":"This Loom explains how a home-battery orchestration system handles ERCOT scarcity events with human-in-the-loop approvals. It simulates 10,000 batteries dispatching over 8,000 hours on a real ERCOT Scarcity evening using real settlement data, committing 36,000 kilowatts and showing gaps like 166 homes and 573 kilowatts dropping out mid-event. The fleet prices the resulting hole at $4,812 at risk and then recovers $4,751 while preserving member backup and using an audit trail for manual overrides. It also demonstrates security and safety checks, rejecting an agent’s attempted overcapacity claim and rolling back a firmware-capability test affecting 100 homes with zero reserve violations. The speaker concludes that outcomes are roughly break-even in held-out tests and notes the code is public on GitHub at Regant/Slash Grid Signal."}