{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/248427df40484bef9c09fb0bcf76b419\" frameborder=\"0\" width=\"1920\" height=\"1440\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1440,"width":1920,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1440,"thumbnail_width":1920,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/248427df40484bef9c09fb0bcf76b419-c5db734e1d8b5ce7.gif","duration":94.2942,"title":"Long-Running Projects","description":"This Loom shows how to create and manage repeating schedules within the same project in Workstaff. It instructs viewers to click the plus button next to the project dates, enter dates for a new schedule, optionally copy from an existing schedule, and then create it. After that, users can switch between schedules by selecting the displayed dates and use the same menu to add a label, change location or dates, repeat the schedule, or delete it. It also explains how to repeat a schedule by selecting Repeat, choosing new dates, copying from an existing schedule, and optionally keeping the same team assignments, then confirming changes with Review and Apply."}