{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/29bc80b47954459d927aa28164b80012\" frameborder=\"0\" width=\"1920\" height=\"1440\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1440,"width":1920,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1440,"thumbnail_width":1920,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/29bc80b47954459d927aa28164b80012-a9e5a3056f8cdf54.gif","duration":402.123,"title":"Fast Field Charging for Battery Module Replacement","description":"This Loom explains the StacSync project decision to charge a single low battery module in the field using the hub inverter and grid power instead of recharging the entire system. Because modules may arrive at about 17 percent SOC while others are higher, the team designed firmware to accept 100 volts (not 400) by boosting the DC bus, capping current, and stopping once the target SOC is reached. The setup uses CAN data to identify the lowest and creates a two-headed harness stack, after which charging begins and then disarms, with a battery communication fault expected. Field tests showed stable cell ramping and grid behavior with total power around 2.1 kW, but charging still took a long time, leading to levers like reducing required offset, doubling charge speed, and exploring faster on-site workflows. Next steps include retesting on REV-E with power analyzer for 1547-2018 requirements starting this week, raising charging power to the upper limit, and conducting a heavy code review."}