{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/30c98f2d8b144d52a00785cb5b77be75\" frameborder=\"0\" width=\"1872\" height=\"1404\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1404,"width":1872,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1404,"thumbnail_width":1872,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/30c98f2d8b144d52a00785cb5b77be75-818cdd8927696f9d.gif","duration":214.4,"title":"Cableteque Summary Page Walkthrough","description":"This Loom explains how the Summary tab in CableTek determines quote pricing, costs, and profit across batch sizes. It starts by using the quote level totals to view cost, labor, factory cost, and selling cost, then goes into the Settings tab to choose a margin method and configure labor rate, additional lead times, and default assembly build lead time. The markup method supports flat overall margin or separate markup for material and labor, with options to copy settings to all batches or set them as default. The example shows a gross profit margin of 35%, and expands the table to break down wire harness materials, labor, assembly selling and factory costs, and any added additional flat-rate charges for tooling or testing."}