{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/42a1d04ae12b4b7b9059a86cde0e96ef\" frameborder=\"0\" width=\"1920\" height=\"1440\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1440,"width":1920,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1440,"thumbnail_width":1920,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/42a1d04ae12b4b7b9059a86cde0e96ef-7d1429bdb6238952.gif","duration":460.532,"title":"FieldEdge and Ply Sync Timing Explained","description":"This Loom explains how FieldEdge and Ply sync and in which direction, including timing and read only behavior for jobs. Categories and materials sync both ways, but materials sync twice daily at 6:30 in the morning and 6:30 in the evening, while locations and warehouses go one way from Ply to FieldEdge and jobs go from FieldEdge to Ply as read only. Materials do not sync in real time when created or edited in Ply, but you can force a sync from Ply by clicking the FieldEdge icon and choosing Materials or Jobs. In Ply, deleting a material can deactivate it in FieldEdge if a workspace integration toggle is enabled, material names must be 31 characters or fewer, and only physical inventory items on FieldEdge invoices appear in Ply."}