{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/46f4942e82dc42d5a61b4842d917a76f\" frameborder=\"0\" width=\"1662\" height=\"1246\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1246,"width":1662,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1246,"thumbnail_width":1662,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/46f4942e82dc42d5a61b4842d917a76f-3baf8eff7b658f30.gif","duration":5907.797,"title":"Skylar First Tower Solo to Smyrna","description":"I coordinated multiple tower and ground frequency interactions for runway operations, including clearances, taxi instructions, and takeoff and landing sequencing. I also managed traffic and pattern flow, with vectors and holding short calls, while altimeters and runway assignments were repeatedly confirmed. Key details included altimeter 29.8, runway 1 and runway 28, and wind calls like 010 at 290 and 020 at 6.1. I requested that callers hold short or report established, and I asked for weather details, including cloud tops around 3,500 feet. Overall, keep runways clear and follow the provided routing and traffic instructions."}