{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/56311cae5b824617a49bd92f7be8636c\" frameborder=\"0\" width=\"1960\" height=\"1470\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1470,"width":1960,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1470,"thumbnail_width":1960,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/56311cae5b824617a49bd92f7be8636c-9505b48c2cf4b5ee.gif","duration":80.451,"title":"Control Status Over Time in Reports","description":"This Loom introduces an experimental feature that shows control status over time, not just the status as of today. In PD’s compliance report, next to control status, it dynamically tracks how many controls are passing versus needing evidence, including notes like “okay” or “due soon,” and it excludes ignored controls. The view can be configured for a time range such as seven days or 60 days to help program admins see whether their program is trending up or down. David demonstrates it temporarily enabled on Vanta for Vanta, noting it helps pinpoint what is not passing by clicking through to filtered control lists."}