{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/6e7c2c5fe1c34ff2abe321a57d12b0b3\" frameborder=\"0\" width=\"1280\" height=\"960\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":960,"width":1280,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":960,"thumbnail_width":1280,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/6e7c2c5fe1c34ff2abe321a57d12b0b3-cc815cf95326dae4.gif","duration":408.98,"title":"Anatomy of a Good RFI","description":"This Loom explains the anatomy of a good RFI and what information to include. It emphasizes writing a very specific subject line and using clear reference points in the description, such as sheet and detail references like A2.0 and A2.10, optionally with attachments. The speaker recommends stating the issue and context from prior conversations with the design team, including a specific question number and relevant drawing numbers or spec sections where applicable. It also covers assigning the RFI to the correct discipline and identifying who the design team should contact on the general contractor side, noting that the software can help track impacts."}