{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/9268860af60b4fda955c7b005494f154\" frameborder=\"0\" width=\"1670\" height=\"1252\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1252,"width":1670,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1252,"thumbnail_width":1670,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/9268860af60b4fda955c7b005494f154-54e2bacf21cf4784.gif","duration":1302.677,"title":"Updating Announcements Slides in PicMonkey","description":"This Loom explains how to update CMG premium announcement slides in PicMonkey by downloading the correct specific graphics and replacing the current ones rather than creating new copies. The speaker downloads the four needed slide variations from the theme, ensuring the right version is chosen (for example, one with three small icons and slides with and without specific text such as “We will begin in just a few minutes,” “Fill out a Connect Card,” “Need Prayer,” and a “send us a message” slide). In PicMonkey, they upload each downloaded image, replace the existing graphic, adjust layer order so icons stay on top, and use blending and positioning tools for readability. After editing, they download and save each slide to Destiny Shared under Current Slides, replacing the originals, and confirm there are five updated slides in total."}