{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/b685d962a68b4efeb1318e9c3cc6abf1\" frameborder=\"0\" width=\"1450\" height=\"1087\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1087,"width":1450,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1087,"thumbnail_width":1450,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/b685d962a68b4efeb1318e9c3cc6abf1-0b352bcb241e167d.gif","duration":301.233,"title":"How Violations and Responses Affect Compliance","description":"This Loom explains how violation status and response status determine an industrial user’s compliance status. It shows that an open violation with no response makes the location non-compliant, and the location remains non-compliant while the violation is in progress. The video demonstrates creating a response document with additional sampling requirements, including a metal sampling schedule with a 15-day administrative period, a one-time report due October 15, and a grab sample for lead and copper and zinc, which moves the violation to in-progress. Once the required sample report is submitted, the response is completed and the violation closes even if subsequent missing data creates additional violations, while more violations continue to keep the location non-compliant."}