{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/b761752c5ae9460ca6ae195faec0d4ef\" frameborder=\"0\" width=\"1920\" height=\"1440\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1440,"width":1920,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1440,"thumbnail_width":1920,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/b761752c5ae9460ca6ae195faec0d4ef-fec1b81a391d4b98.gif","duration":183.787,"title":"Review Installer Packet PDF","description":"This Loom reviews the project or installer job packet and how it is generated and updated from the Compass work order. It explains that the PDF opens in a new tab from the notes section and can also be accessed through the AGM mobile app, with personal data such as phone number, email, and pricing stripped out while installation details remain. The packet includes job descriptions by category (for example removal, sprinklers, base, turf, infill, and wire), access photos, site photos, existing damage, and uploaded documents that are imported directly as document 1, document 2, and so on. It also notes that as builds include change orders, the final materials and quantities section is updated cumulatively with category, product, quantity, units, description, and the date completed."}