{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/c296f311a074486cb83a50c578a28525\" frameborder=\"0\" width=\"1898\" height=\"1423\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1423,"width":1898,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1423,"thumbnail_width":1898,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/c296f311a074486cb83a50c578a28525-5bb82a2fccbc5aea.gif","duration":266.245,"title":"Reopening Missed Inspections Feature","description":"In this video, I’m excited to introduce a new feature that allows you to reopen missed inspections, even after they’ve been closed. We developed this to better align with real operational needs, as sometimes inspections need to be completed after their due dates. I’ll walk you through the steps to access this feature, including the necessary permissions and conditions for reopening inspections. Please make sure to review the guidelines I’ve outlined, as they are crucial for using this feature effectively."}