{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/db9c6ded05c14603bff90c1127b07266\" frameborder=\"0\" width=\"1920\" height=\"1440\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1440,"width":1920,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1440,"thumbnail_width":1920,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/db9c6ded05c14603bff90c1127b07266-9d6e2dff52e9acea.gif","duration":307.072,"title":"Building Installer Packet Project Details","description":"This Loom explains how to create and submit the installer packet by adding project details in the Costco automated system after the contract is fully signed and the deposit or project payment is confirmed in Centaur. It walks through the installer packet fields, including whether site inspection is needed, required access photos (minimum one), site photos (minimum three), and uploading the drawing PDF. It also covers documenting existing damage or ticking no visible damage, and optionally uploading a walkthrough video up to 60 seconds plus notes. Once all required items are uploaded, the user clicks Build Installer Packet to submit it to the production team."}