{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/ef1f0556d43d4d419891513a4457ed8c\" frameborder=\"0\" width=\"1920\" height=\"1440\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1440,"width":1920,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1440,"thumbnail_width":1920,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/ef1f0556d43d4d419891513a4457ed8c-de08ff61c26557ca.gif","duration":671.601,"title":"WF - Dev Sites - 04 - Kickoff","description":"Hello, Vaishali. In this video, I’m kicking off the Punta de Rasca project, where we need to prepare development site pipelines and gather current information from our client, Focus Home Inmobiliaria. The site is located in Tenerife, and we’ll be working on a building with three levels, ensuring it aligns with the existing structures around it. I’ll be creating an architectural and context model, and I need you to assist in preparing the layouts and site analysis plan. Please make sure to check the dimensions and setbacks from GraphCAN, and let’s coordinate to request a council meeting as needed."}