{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/f0c40fdcad154ac68a079e7b27203282\" frameborder=\"0\" width=\"1894\" height=\"1420\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1420,"width":1894,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1420,"thumbnail_width":1894,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/f0c40fdcad154ac68a079e7b27203282-c9071135dad5a1fc.gif","duration":213.45,"title":"Item Budget","description":"I walked through how to create an item level budget in Design Manager before adding project specifications and items. First, I went to Projects, opened my existing project, then created a generic item by entering a generic name, quantity, units of measure, and other optional fields, leaving cost related fields blank, and saving. In the item, I entered the budget amount in the unit budget field, and the extended budget populated from quantity. I also showed how to edit the generic budget item with actual vendor details, ship to, and costs, then run budget reports from the Reports icon under Project Management. No specific action was requested of viewers."}