{"type":"video","version":"1.0","html":"<iframe src=\"https://www.loom.com/embed/f4879a2279744c1a86864989d8722ec1\" frameborder=\"0\" width=\"1508\" height=\"1131\" webkitallowfullscreen mozallowfullscreen allowfullscreen></iframe>","height":1131,"width":1508,"provider_name":"Loom","provider_url":"https://www.loom.com","thumbnail_height":1131,"thumbnail_width":1508,"thumbnail_url":"https://cdn.loom.com/sessions/thumbnails/f4879a2279744c1a86864989d8722ec1-7bc35623281bf19f.gif","duration":260.878,"title":"Sample Report Mass Calculations 🧮","description":"Hi, this is Morgan with SWIFT Compliant Industrial Pre-Treatment. In this video, I walk through our new sample report mass calculation functionality that computes total mass, pounds per day, and other mass results from flow and concentration data. I show that if you enter flow values without start and end dates, they will not be included in the mass calculations. Once flow is saved, the system looks back from the due date based on the schedule, converts units automatically, and populates the mass results. You can review which data drove each calculation, and override a calculated value manually if needed, then delete the manual value to revert."}