<?xml version="1.0" encoding="UTF-8"?><oembed><type>video</type><version>1.0</version><html>&lt;iframe src=&quot;https://www.loom.com/embed/187add2f2dd148e29ee976e250baf47f&quot; frameborder=&quot;0&quot; width=&quot;1728&quot; height=&quot;1296&quot; webkitallowfullscreen mozallowfullscreen allowfullscreen&gt;&lt;/iframe&gt;</html><height>1296</height><width>1728</width><provider_name>Loom</provider_name><provider_url>https://www.loom.com</provider_url><thumbnail_height>1296</thumbnail_height><thumbnail_width>1728</thumbnail_width><thumbnail_url>https://cdn.loom.com/sessions/thumbnails/187add2f2dd148e29ee976e250baf47f-78548c62ced962a3.gif</thumbnail_url><duration>425.536</duration><title>PawPal System Reliability Testing for Scheduling 🐾</title><description>Hi, I am Ashikul Alam, and this is my final project where I extended my PawPal app to add system reliability testing for proper scheduling. I built a flow where I enter owner info, add pets with guardrails to prevent duplicates, then create tasks with duration, priority, frequency, and a non negotiable option. I generated schedules from a start time and included reliability checks that validate input format and rules so it does not hallucinate. When I added a one time non negotiable vet visit, it was scheduled and a food task was skipped as expected. No action is requested from viewers.</description></oembed>