<?xml version="1.0" encoding="UTF-8"?><oembed><type>video</type><version>1.0</version><html>&lt;iframe src=&quot;https://www.loom.com/embed/551999e60c544de58ca43cb66b936df4&quot; frameborder=&quot;0&quot; width=&quot;1920&quot; height=&quot;1440&quot; webkitallowfullscreen mozallowfullscreen allowfullscreen&gt;&lt;/iframe&gt;</html><height>1440</height><width>1920</width><provider_name>Loom</provider_name><provider_url>https://www.loom.com</provider_url><thumbnail_height>1440</thumbnail_height><thumbnail_width>1920</thumbnail_width><thumbnail_url>https://cdn.loom.com/sessions/thumbnails/551999e60c544de58ca43cb66b936df4-44c561245dc75ca0.gif</thumbnail_url><duration>342.661</duration><title>Second Change Order &amp;amp; Updates to the Installer Packet</title><description>This Loom demonstrates how recording a second change order in a Costco contract updates the installer packet and the project’s scope history. After the first change order showed a $1,650 increase (version 2), the second change order (version 3) swaps PetTurfInfil from Hydrofil to Wonderfil, adjusts removal by reducing 200 square feet, and applies a $500 net decrease to the contract amount, bringing it to $16,500. Once signed, the installer packet link and materials sections update, showing “update 1” and “update 2” entries for each product category. The updated job details reflect 1,300 square feet of removal and Wonderfill infill.</description></oembed>