<?xml version="1.0" encoding="UTF-8"?><oembed><type>video</type><version>1.0</version><html>&lt;iframe src=&quot;https://www.loom.com/embed/6920c1a997be49a89aeb8f9d1dbc6360&quot; frameborder=&quot;0&quot; width=&quot;1280&quot; height=&quot;960&quot; webkitallowfullscreen mozallowfullscreen allowfullscreen&gt;&lt;/iframe&gt;</html><height>960</height><width>1280</width><provider_name>Loom</provider_name><provider_url>https://www.loom.com</provider_url><thumbnail_height>960</thumbnail_height><thumbnail_width>1280</thumbnail_width><thumbnail_url>https://cdn.loom.com/sessions/thumbnails/6920c1a997be49a89aeb8f9d1dbc6360-0e8d971d35835c0d.gif</thumbnail_url><duration>467.30666599999995</duration><title>East Marshall Facilities Project Update and Timeline</title><description>This Loom provides an update on East Marshall School District facilities projects funded by the $19.8 million bond approved in November 2025. The district describes progress through design development with FEH and construction planning with Estes Construction and Alvine Engineering, including value engineering and bid packages that will be reviewed in a special board meeting on August 10. At Legrand, the scope shifts from a planned one-story 7th and 8th grade wing to a two-story 9 through 12 addition, with renovations and HVAC work in the 1978 building in summer 2027 and a hub connector after the 1923 building is addressed. The projects will be phased, with about $15 million covered by the first bond issuance and about $4.6 million by the second, and viewers are directed to the district facilities webpage for timelines, videos, and project details.</description></oembed>