<?xml version="1.0" encoding="UTF-8"?><oembed><type>video</type><version>1.0</version><html>&lt;iframe src=&quot;https://www.loom.com/embed/a52314458f554fe79296a5fc1099fed9&quot; frameborder=&quot;0&quot; width=&quot;1920&quot; height=&quot;1440&quot; webkitallowfullscreen mozallowfullscreen allowfullscreen&gt;&lt;/iframe&gt;</html><height>1440</height><width>1920</width><provider_name>Loom</provider_name><provider_url>https://www.loom.com</provider_url><thumbnail_height>1440</thumbnail_height><thumbnail_width>1920</thumbnail_width><thumbnail_url>https://cdn.loom.com/sessions/thumbnails/a52314458f554fe79296a5fc1099fed9-11966ad6d162f72e.gif</thumbnail_url><duration>370.08</duration><title>Clearstory &amp;lt;&amp;gt; Plexxis Integration Demo</title><description>This Loom demonstrates how to link a ClearStory project to Plexus and push CLR change requests into Plexus. In the CLR log filtered for the demo project, the presenter shows three change requests: one already synced, one updated with a new total, and a third not yet pushed, then pushes the two bottom ones to Plexus. For the second CLR, created from TNM tags, the system auto-numbers the new contract as number five, sets status to open, and then pushes it as line items with descriptions from the TNM tags and required cost codes and activity code selections. Finally, the presenter verifies in Plexus that the lump sum update reflects the new total and that labor, materials, equipment, and markups land in their respective tabs, with miscellaneous or other costs included under other costs and charges.</description></oembed>