<?xml version="1.0" encoding="UTF-8"?><oembed><type>video</type><version>1.0</version><html>&lt;iframe src=&quot;https://www.loom.com/embed/d042a8532da9438b89f259b6ba731a1b&quot; frameborder=&quot;0&quot; width=&quot;1920&quot; height=&quot;1440&quot; webkitallowfullscreen mozallowfullscreen allowfullscreen&gt;&lt;/iframe&gt;</html><height>1440</height><width>1920</width><provider_name>Loom</provider_name><provider_url>https://www.loom.com</provider_url><thumbnail_height>1440</thumbnail_height><thumbnail_width>1920</thumbnail_width><thumbnail_url>https://cdn.loom.com/sessions/thumbnails/d042a8532da9438b89f259b6ba731a1b-9f470e96e41f7274.gif</thumbnail_url><duration>248.106</duration><title>Add a Due Diligence Statement to a Delivery</title><description>This Loom explains how to generate a delivery-level due diligence statement (DDS) in Interu. It covers opening the relevant delivery, adding a new EUDR DDS reference (pre-filled with the delivery name, editable for easier tracing), and selecting the activity type such as export, import, or domestic while completing required operator fields. For imports, the country of activity and country of entry default from the delivery’s to location, and for exports the country of exit defaults from the from location, with validity period set and optional geolocation confidentiality for non-sharing downstream. After generating, the DDS status moves from Pending to Submitted when confirmed, and the Traces reference appears.</description></oembed>